Send Message
Home News

News | MOVELASER With Denmark WoXu Energy (Ø rsted) Offshore Wind Project Acceptance Smoothly

Certification
China Nanjing Movelaser Co., Ltd. certification
China Nanjing Movelaser Co., Ltd. certification
Customer Reviews
I am very satisfied with the after-sales service attitude, the product quality is excellent, and I hope to continue to maintain it

—— Liyong Xiong

Your company's products have shown excellent performance and excellent quality during operation, providing strong support in scenarios such as early project wind measurement and operational project evaluation; Your team provides timely response, effective communication, and thoughtful service in equipment installation, maintenance.

—— Yunda Li

After the product finds problems, it can be quickly dealt with after the sale. It is recommended to make the product suitable for more environments。

—— Jiemin Fu

Overall I am very satisfied and hope to continue to provide us with more advanced, reliable and stable radar equipment.

—— Fan Yang

It is hoped that the products will continue to be optimized, updated and iterated, the quality will be more stable, and the service, delivery and after-sales will continue to maintain high quality, and achieve the industry-leading level.

—— Yuwei Wang

The delivery of the product, the processing of the equipment is very timely

—— Long Chen

Positive attitude of marketing personnel, timely after-sales service

—— Kai Zhao

Continue to work hard, win-win cooperation

—— Yuyan Xie

The equipment is easy to install and suitable for unit testing.

—— Luke Wang

The equipment and service are very good, and I look forward to continuing cooperation in the future.

—— Mingjie Zhou

The ground-based wind lidar has good performance and has been recognized by our internal and complete machine manufacturers, and there is no objection to the test results. The sales staff have extensive technical knowledge and professional answers. The on-site staff are active and look forward to cooperating again.

—— Kunpeng Lu

In the radar installation service, the marketing personnel have good attitude, strong technical ability, and solve problems in place, which provides a solid guarantee for the transportation and installation of lidar.

—— Liang Gao

I'm Online Chat Now
Company News
News | MOVELASER With Denmark WoXu Energy (Ø rsted) Offshore Wind Project Acceptance Smoothly
Latest company news about News | MOVELASER With Denmark WoXu Energy (Ø rsted) Offshore Wind Project Acceptance Smoothly

1643348754512257.gif

 

 

Quote:

From September 21, 2021 to March 30, 2022, after six months of rigorous testing, the offshore lidar wind measurement project -- Aether Project, which is a cooperation project between Mulaser and ø rsted, the global offshore wind power giant, was successfully accepted. As the only wind lidar manufacturer in China in the official supply chain system of Woxu Energy, Molas B300M, the offshore wind lidar produced by Mulei Laser, has been highly recognized by Woxu Energy.

 

Project Background:

As the world's largest offshore wind power developer, Woxu Energy has installed more than a quarter of the world's total offshore wind power capacity. In 2022, Woxu Energy won the title of "The World's Most sustainable Energy Company", and was listed on the CLIMATE Change A List, and is recognized as A global leader in climate action. In view of the strong demand of offshore wind power wind measurement, Woxu Energy and our company will start the wind measurement lidar project docking from 2021. This is the first cooperation project on wind measuring lidar between Muradium laser and Woxu Energy, which will lay a solid foundation for the subsequent cooperation between the two sides.

 

Project Overview:

The project is located in the Danish National Large fan Test Center of ø Sterild in North Jutland Peninsula, about 3.9 km offshore. Lidar was compared with a 244-meter wind tower with levels of 10, 40, 50, 70, 106, 140, 178, 210 and 244 meters.

 

The lidar under test was located between 11.5 meters and 15.5 meters west of the north face of the wind tower. The location was chosen to maximize the correlation between the lidar and the wind tower, while avoiding the laser beam of the lidar being obscured at any location by the wind tower and its cable.

 

 

1648609351453775.png

Figure 1 Satellite map of the project site

 

图片2.png

Figure 2 Lidar on-site real shot

 

Project Effect:

After about six months of rigorous testing, Molas B300M completed this task with outstanding performance and successfully passed the acceptance of Woxu Energy. The correlation R² between radar data and wind cup anemometer data is above 0.9984 (FIG. 4), and the overall data efficiency is above 99% (FIG. 5). This project demonstrates the advantages of Molas B300M's high measurement accuracy, high data efficiency and stable system performance during the execution of the offshore wind measurement project.

 

图片3.png

Figure 3. Performance graph of lidar wind measurement performance

 

1648609415187252.png

Figure 4 Comparison of wind speed between cup anemometer and lidar

 

图片5.png

Figure 5. Evaluation diagram of lidar data efficiency

 

 

"Molas B300M delivers very high measurement performance and meets most of our expectations for a world-class wind lidar instrument. Molas B300M delivers very high measurement performance, Meeting most of our expectations of world Class Wind Lidar Instruments.)"

 

Muradium laser in the initial cooperation with Woxu Energy showed a strong wind measurement technology strength, with the actual case verified Molas B300M high measurement accuracy, high data efficiency, stable system performance and other advantages. We also hope that in the future, Molas B300M will contribute to the development of offshore wind power worldwide.

 

 

Copywriting/editing/typesetting: Molas Marketing Team

6.gif

Pub Time : 2022-03-30 16:20:47 >> News list